Completed

All
Andaman & Ashino
Lakepark @ Gravit8
Nordica & Adria
Shop Lot
  • Gravit8 Facility - Park, Children play are, Swimming Pool, Basketball
    Facility Area Top View Shot
  • Kids Pool
  • Swimming Pool
  • SWIMMING POOL
  • Adria Lobby
  • Adria - Drop Off Area
  • Nordica Lobby
  • Nordica - Drop Off Area
  • Adria Tower
  • Water Feature
  • Playground
  • Lounge Room
  • Gymnasium
  • Kids Room
  • Reading Room
  • Function Room
  • Theatre Room
  • Gym Room
  • Lounge Room
  • Coworking Space
  • Games Room
  • Kids Playing Room
  • Multipurpose Court
  • Cabanas Overlooking Jacuzzi
  • Boardwalk
  • Water Features
  • Facilities Floor
  • Swimming Pool
  • Swimming Pool
  • Facilities Floor
  • Ashino Lobby
  • Andaman Lobby
  • OVERALL VIEW
  • 2 July 2021: Phase 2B Theatre Room
  • 18 May 2021: Andaman - final painting in progress
  • 18 May 2021: Landscape Level 8 - hardscape and softscape work in progress
  • Overall view as @ April 2020
  • Andaman & Ashino Facilities floor
  • Overall view of Ashino Tower progress
  • Level 8 planting in progress
  • Level 8 planting in progress
  • 2b2 - arch slab in progress
  • 2b2 - arch slab in progress
  • 2b1 - roof completed
  • PODIUM - EARTH FILLING IN PROGRESS.
  • PIER8 - in-mall saltwater aquarium
  • PIER8 - in-mall saltwater aquarium
  • Overall view as @ December 2020
  • Andaman - Level 32 RC Roof Slab in Progress
  • Podium - Earth filling and draincell installation in progress
  • Pier8 Retail As @ Oct 2020
  • Topping-off ceremony for Andaman and Ashino Towers
  • ASHINO LEVEL 30 SLAB IN PROGRESS
  • ANDAMAN LEVEL 32 ZONE 1&2 IN PROGRESS
  • GRAVIT8 AERIAL PHOTO AS @ SEPT 2020
  • Gravit8 Aerial Photo as @ June 2020
  • Property | kland | mitraland | gravit8 360 degree
    AN EXCITING RETAIL EXPERIENCE, COMING SOON!
  • PIER8 |property malaysia | Mitraland | real estate
    PIER8 MAIN ENTRANCE
  • Andaman Tower | construction site | gravit 8 mitraland
    ANDAMAN TOWER HAS REACHED LEVEL 15
  • Nordica & Adria Handed Over on Nov 2019
  • Nordica & Adria Handed Over on Nov 2019
  • Outer View Nordica and andria | may 2019
    External Nordica & Adria at near completion and expected to handover by end 2019
  • Pier 8 | Mitraland site
    Pier 8 finishing works in progress
  • Retail | mitraland | Working site
    Retail concourse finishing works in progress
  • Nordica and Adria tower | Top view | gravit 8 | Mitraland
    Phase 2B Carpark floor in progress
  • Nordica and Adria tower | Top view | gravit 8 | Mitraland
    Facilities deck in progress for Nordica & Adria towers.
  • Lake Park | Gravit8 | Events | mitraland
    Lakepark 1
  • Lake Park | Gravit8 | swimming pool | mitraland
    Lakepark 2
  • Lake Park view of mitraland walking
    Lakepark 3
  • lake park | corridor | mitraland
    Lakepark 4
  • lake park | corridor | mitraland
    Lakepark 5
  • lake View property Mitaland | Sunshine view | mitraland
    Lakepark 7
  • Lake View Aerial Outer view Mitraland propoerty
    Lakepark 6
  • Phase 2-1
  • Phase 2-2
  • Adria and nordica | mitraland | construcution property
    Adria - Structural framework in progress at level 24 (as at 31/08/2018). Nordica - Structural framework in progress at level 30
  • Phase 2-5
  • Andaman | working phase | property | gravit 8 | mitraland
    Andaman - Work below ground level in progress
  • Phase of Mitraland Property | outer view
    Shop Lot
  • Phase of Mitraland Property | outer view
    Shop Lot
  • Phase of Mitraland Property | outer view
    Ph1-3
  • Phase of Mitraland Property | outer view
    Ph1-4
  • Phase of Mitraland Property | outer view
    Ph1-5

Disclaimer: Any sketches, illustrations, renderings, images, pictures, amenities, food services, unit finishes, plans, specifications, art and/or visuals shown and featured in this website including the interior design concepts, colour schemes and suggested furnishings in the completed unit/development are artist’s impression only and shall not be taken as a representation of fact. Whilst every reasonable care has been taken in providing this information the developer shall not be held responsible for any inaccuracy and changes as may be required by the authorities.